Prices

Prices

With Decision № Ц-11 dated 01.07.2018 the Energy and Water Regulatory Commission approved the following prices for CEZ Distribution Bulgaria AD for the second price period from 01.07.2018

Prices

Value (VAT excluded)

Price for access to the electricity distribution grid for business customers in BGN/kW/day

0,01796

Price for access to the electricity distribution grid for domestic customers in BGN/kWh

0,00519

Price for transmission of electricity energy through the medium voltage distribution grid in BGN/kWh

0,00971

Price for transmission of electricity energy through the low voltage distribution grid in BGN/kWh

0,03245

 

Notes:

The price for access to the electricity distribution grid in BGN/kW/day shall be paid by all business customers connected to the medium and low voltage grid.

The price for access to the electricity distribution grid in BGN/kWh shall be paid by all domestic customers.

The price for transmission through the medium voltage distribution grid shall be paid by all customers connected to the medium voltage.

The price for transmission through the low voltage distribution grid shall be paid by all customers connected to the low voltage grid.

 Price list №1 for services offered by CEZ Distribution Bulgaria for public and corporate consumers effective from 29.05.2013

No Description Price without VAT, leva  VAT, leva Price with VAT, leva  Execution term /days/
1. New connections of temporary moveable objects:       7
1.1. low voltage with direct meter reading 34,70 6,94 41,64
1.2. low voltage with indirect meter reading 110,25 22,05 132,30
1.3. middle voltage  110,25 22,05 132,30
2. Change of tariff from 1T to 2T (2T electrometer exist and instaliation of tariff switch) for indirect meter reading 19,17 3,83 23,00* 7
3. Change of tariff from 2T to 1T 19,17 3,83 23,00* 7
4. Change of tariff from 2T or ЗТ to lower (indirect meter reading) 19,17 3,83 23,00* 7
5. Change of 1Т electrometer to 2Т electrometer and installation of tariff switch 19,17 3,83 23,00* 7
6. Change of tariffs from 1T or 2T to ЗТ (indirect meter reading) 19,17 3,83 23,00* 7
7. Change of tariffs for direct meter reading 19,17 3,83 23,00
8. Technical review based on customer order 43,46 8,69 52,15 7
9. Technical review of device for trade measurement based on customer order       7
9.1.  indirect meter reading      
   - without standard device 25,00 5,00 30,00*
   - with standard device 25,00 5,00 30,00* 5
9.2.  - direct meter reading       7
   - without standard device 25,00 5,00 30,00*
   - with standard device 25,00 5,00 30,00* 5
10. Technical review of the electrometer based on customer order and issue of protocol for standardization of Bulgarian Metrology Institute       7
  Price is based on 10.1 + 10.2 (total price = price for ERP + price for Bulgarian Metrology Institute)      
10.1.  - For ERP 25,00 5,00 30,00*
10.2.  - For Bulgarian Metrology Institute /under Government Decree № 95 of April 19, 2013 for approving the Tariff of fees collected by the Bulgarian Metrology Institute promulgated in State Gazette, number 40 dated 30.04.2013/ number 85, 24.10.2017      
   - 1 phase electrometers 24,00   24,00
   - 3 phases electrometers 36,00   36,00
   - combined electrometers for active and reactive energy 90,00   90,00
11. Control reading of electrometer on customer order 30,87 6,17 37,04 7
12. Installation of additional section for additional devices 96,82 19,36 116,18 7
13. Reconnection of the supply of electricity for a client after not paid bills        
   - from electric meter or safety fuse 15,83 3,17 19,00 * 1
   - from outside network 19,17 3,83 23,00 * 1
   - from distribution device 100,42 20,08 120,50 1
   - operating switching over 25,00 5,00 30,00 * 7
14. Express reconnection of the supply of electricity for a client after not paid bills (within the working day)       6 часа
   - from electric meter or safety fuse 31,67 6,33 38,00 *
   - from outside network 38,33 7,67 46,00 *
   - from distribution device 200,84 40,16 241,00
   - operating switching over 50,83 10,17 61,00 *
15. Temporary disconnection of the supply of electricity at client's request       7
   - from electric meter or safety fuse 15,83 3,17 19,00 *
   - from outside network 19,17 3,83 23,00 *
   - from distribution device 100,42 20,08 120,50
   - operating switching over 25,00 5,00 30,00 *
16. Reconnection of the supply of electricity for a client at client's request       7
   - from electric meter or safety fuse 32,03 6,41 38,44
   - from outside network 38,77 7,75 46,52
   - from distribution device 100,42 20,08 120,50
   - operating switching over 129,70 25,94 155,64
17. Termination of the registration of the customer and safeguarding       7
   - with direct meter reading from electrometer 37,07 7,41 44,48
   - with direct meter reading from outside network 54,66 10,93 65,59
   - with indirect meter reading LV 85,64 17,13 102,77
   - with indirect meter reading MV 163,11 32,62 195,73
18. Measurement of the quality of the electricity at level LV (one week)       10
   - one phase feeding 31,67 6,33 38,00 *
   - three phases feeding /direct measurement/ 31,67 6,33 38,00 *
   - three phases feeding /indirect measurement/ 31,67 6,33 38,00 *
19. Installation of trade measurement device owned by customer       7
   - with direct measurement 25,00 5,00 30,00 * 
   - with indirect measurement LV 25,00 5,00 30,00 * 

* Note: The price has been changed in relation to an execution of protocol decision of SEWRC №144/06.10.2010.

 

Price list №2 for services offered by research departments of CEZ Distribution Bulgaria for new connections

No Description  Price without VAT, leva  VAT, leva  Price with VAT, leva
1. Study and design of external electricity supply network, technical advices and certification for power      
1.1. Price for ERP up to 15 kW 80,90 16,18 97,08
1.2. Price for ERP up to 50 kW 96,31 19,26 115,57
1.3. Price for ERP up to 100 kW 122,00 24,40 146,40
1.4. Price for ERP up to 500 kW 211,92 42,38 254,30
1.5. Price for ERP up to 1 000 kW 366,04 73,21 439,25
1.6. Study and design of external electricity supply network, technical advices and certification for power over 1 000 kW      
  Price is based on 2.1 + 2.2 ( total price = price for ERP + price for NEC)      
2.1. For ERP 789,90 157,98 947,88
2.2. For NEC from date 01.09.2013      
  - price for consumer 611,88 122,37 734,25 лв
  - price for producer 3077,17 615,43 3692,60
3. Study and design of external electricity supply network, technical advices and certification for power over 5 000 kW      
  Price is based on 3.1 + 3.2 ( total price = price for ERP + price for NEC)      
3.1. For ERP 944,03 188,81 1132,84
3.2. For NEC from date 01.09.2013
  - price for consumer 611,88 122,37 734,25
  - price for producer 3077,17 615,43 3692,60
4. Technical advice to designers , designing and modification of projects      
4.1. Up to 2 hours 61,64 12,33 73,97
4.2. For every next hour (lv./hour) 30,82 6,16 36,98
5. Investigation of objects for preparation ot projects and their execution      
5.1. Up to 3 hours 96,31 19,26 115,57
5.2. Over 3 hours 119,44 23,89 143,33
6. Participation in acceptance commission 142,55 28,51 171,06
7. Submission of data from technical database      
7.1. Up to 2 hours 61,64 12,33 73,97
7.2. For every next hour (lv./hour) 30,82 6,16 36,98
8. Issue of a statement for 72 hours probation and DNSK 46,23 9,25 55,48
9. Agreement of electric panels (lv. per 1 panel)      
9.1. Panel LV 33,64 6,73 40,37
9.2. Panel MV 45,15 9,03 54,18
10. Agreement of external supply for new connections under art.117 61,64 12,33 73,97
11. Agreement of plans, visa , urban planning and schemes 120,00 24,00 144,00
12. Agreement of plans for reallocation of energy objects under art.73 80,90 16,18 97,08
13. Investigation of objects for preparation or projects for reallocation of energy object under art.73      
13.1. Up to 3 hours 96,31 19,26 115,57
13.2. Over 3 hours 119,44 23,89 143,33
II. Operation services, repair and maintenance of networks
 Work on MV networks    Price without VAT VAT Price with VAT
1. Tour, inspection and revision of power-MV for 1 km      
  - price for regular service 99,50 19,90 119,40
  - price for express service 199,01 39,80 238,81
2. Replacement of insulator chain      
  - price for regular service 26,68 5,34 32,02
  - price for express service 53,36 10,67 64,03
3. Replacement of insulator on console      
  - price for regular service 22,93 4,59 27,52
  - price for express service 45,87 9,17 55,04
4. Repair of bridge compound      
  - price for regular service 18,02 3,60 21,62
  - price for express service 36,04 7,21 43,25
5. Dismantling of wire one interpole network MV for one conductor      
  - price for regular service 23,71 4,74 28,45
  - price for express service 47,42 9,48 56,90
6. Replacing a section disconnector type ROS      
  - price for regular service 294,96 58,99 353,95
  - price for express service 589,92 117,98 707,90
7. Repair of section disconnector type ROS      
  - price for regular service 159,42 31,88 191,30
  - price for express service 318,84 63,77 382,61
8. Restore broken wire 1 / one / phase 1 / one / interpole of MV      
  - price for regular service 48,14 9,63 57,77
  - price for express service 96,28 19,26 115,54
9. Excavation for installation of cable socket and cabling for MV 1m3      
  - price for regular service 61,52 12,30 73,82
  - price for express service 123,05 24,61 147,66
10. Construction of cable socket mV (three wires)      
  - price for regular service 303,85 60,77 364,62
  - price for express service 607,69 121,54 729,23
11. Construction of cable head MV / set /      
  - price for regular service 128,27 25,65 153,92
  - price for express service 256,54 51,31 307,85
12. Installation or replacement of cathode pipe      
  - price for regular service 35,09 7,02 42,11
  - price for express service 70,19 14,04 84,23
13. Localization of damage air network MV      
  - price for regular service 111,83 22,37 134,20
  - price for express service 223,66 44,73 268,39
14. Turn off power and preparation for work on client's request      
  - price for regular service 38,48 7,70 46,18
  - price for express service 76,96 15,39 92,35
15. Lifting of bent reinforced concrete pillar      
  - price for regular service 167,58 33,52 201,10
  - price for express service 335,16 67,03 402,19
16. Replacement of reinforced concrete pillar      
  - price for regular service 308,07 61,61 369,68
  - price for express service 616,13 123,23 739,36
17. Coupling / uncoupling / deviation 20kV      
  - price for regular service 40,99 8,20 49,19
  - price for express service 81,98 16,40 98,38
Work on LV networks    Price without VAT VAT Pice with VAT
 18. Securing a working space      
  - price for regular service 32,26 6,45 38,71
  - price for express service 64,52 12,90 77,42
19. Replacement of insulator LV or installation of additional item      
  - price for regular service 24,10 4,82 28,92
  - price for express service 48,20 9,64 57,84
20. Installation of air recordoman deviation to 40m. Length      
  - price for regular service 28,04 5,61 33,65
  - price for express service 56,08 11,22 67,30
21. Installation of a new pillar LV      
  - price for regular service 246,99 49,40 296,39
  - price for express service 493,97 98,79 592,76
22. Displacement of existing pillar LV      
  - price for regular service 315,40 63,08 378,48
  - price for express service 630,79 126,16 756,95
23. Restore broken wire 1 / one / interpole      
  - price for regular service 36,37 7,27 43,64
  - price for express service 72,74 14,55 87,29
24. Installation of additional groundings      
  - price for regular service 45,98 9,20 55,18
  - price for express service 91,95 18,39 110,34
25. Dismantling of conductor 1 / a / interpole network LV 1 / pcs / wire      
  - price for regular service 20,23 4,05 24,28
  - price for express service 40,47 8,09 48,56
26. Construction of cable socket LV      
  - price for regular service 156,48 31,30 187,78
  - price for express service 312,95 62,59 375,54
27. Construction of cable head LV      
  - price for regular service 54,81 10,96 65,77
  - price for express service 109,61 21,92 131,53
28. Installation of supply tank LV making foundation      
  - price for regular service 293,30 58,66 351,96
  - price for express service 586,59 117,32 703,91
29. Localization of damage in LV network      
  - price for regular service 58,03 11,61 69,64
  - price for express service 116,05 23,21 139,26
30. Replacing a blown fuse LV      
  - price for regular service 7,07 1,41 8,48
  - price for express service 14,15 2,83 16,98
31. Mounting of subscriber console LV      
  - price for regular service 22,88 4,58 27,46
  - price for express service 45,75 9,15 54,90
32.  Lifting of bent LV pillar      
  - price for regular service 154,14 30,83 184,97
  - price for express service 308,29 61,66 369,95
33. Installation of street lighting lamp      
  - price for regular service 29,93 5,99 35,92
  - price for express service 59,86 11,97 71,83
34. Repair of street lighting lamp      
  - price for regular service 22,93 4,59 27,52
  - price for express service 45,87 9,17 55,04
35. Replacement of street lighting lamp      
  - price for regular service 13,60 2,72 16,32
  - price for express service 27,21 5,44 32,65
36. Coupling / uncoupling / of recordoman deviation      
  - price for regular service 17,90 3,58 21,48
  - price for express service 35,80 7,16 42,96
Transformer stations (TS) and key stations Price without VAT VAT Price with VAT
37.  Securing a working place and giving access for work      
  - price for regular service 43,26 8,65 51,91
  - price for express service 86,51 17,30 103,81
38. Inspection of facilities in TS      
  - price for regular service 18,27 3,65 21,92
  - price for express service 36,54 7,31 43,85
39. Replacement of pillar insulator for 1/one/ unit      
  - price for regular service 32,59 6,52 39,11
  - price for express service 65,19 13,04 78,23
40. Replacement of passtrough insulator      
  - price for regular service 55,86 11,17 67,03
  - price for express service 111,72 22,34 134,06
41. Replacement of edge-cutting disconnector      
  - price for regular service 162,47 32,49 194,96
  - price for express service 324,95 64,99 389,94
42. Replacement of fuses stand for 1/one/ phase      
  - price for regular service 22,66 4,53 27,19
  - price for express service 45,31 9,06 54,37
43. Mount of power disconnector      
  - price for regular service 279,86 55,97 335,83
  - price for express service 559,72 111,94 671,66
44. Replacement of power transfomer station      
  till 630 кVА - regular service 216,78 43,36 260,14
  till 630 кVА - express service 433,56 86,71 520,27
  above 630 кVA - regular service 242,10 48,42 290,52
  above 630 кVА - express service 484,20 96,84 581,04
45. Oil refilling in power transformer station      
  - price for regular service 17,01 3,40 20,41
  - price for express service 34,02 6,80 40,82
46. Replacement of switchboard LV in transformer station      
  - price for regular service 234,99 47,00 281,99
  - price for express service 469,98 94,00 563,98
47. Repair and reconstruction of outlet field LV in LV switchboards      
  - price for regular service 99,50 19,90 119,40
  - price for express service 199,01 39,80 238,81
48. Replacement of HV fuse      
  - price for regular service 8,61 1,72 10,33
  - price for express service 17,21 3,44 20,65
49. Replacement of sign "Risk for life" in transformer station      
  - price for regular service 15,79 3,16 18,95
  - price for express service 31,57 6,31 37,88
50. Transformer station equipment claening for one new connection      
  - price for regular service 30,54 6,11 36,65
  - price for express service 61,08 12,22 73,30
51. Transformer station prevention      
  With one transformer machine MV/LV 149,26 29,85 179,11
  With two transformer machine MV/LV 199,01 39,80 238,81
   With three transformer machine MV/LV 248,76 49,75 298,51
52. Double side agreement for combined technical operation - per month 120,00 24,00 144,00
Laboratory services Price without VAT  VAT Price with VAT
53. Locating a cable damage MV and LV Performed in methodology and valuation
  cable length- to 1 km. cable. Performed in methodology and valuation
  cable length- over 1 km. Performed in methodology and valuation
54.  Testing of MV cables with high voltage  Performed in methodology and valuation
55. Phasing of MV cables Performed in methodology and valuation
56. Phasing cables LV Performed in methodology and valuation
57. Determining the route of the cable line Performed in methodology and valuation
58. Specifying the cable in the bundle of cables Performed in methodology and valuation
59. High voltage tests of dielectric gloves, dielectric boots and dielectric rugs Performed in methodology and valuation
60. High-voltage tests of rods Performed in methodology and valuation
61. High-voltage tests of insulation stands Performed in methodology and valuation
62. High -voltage tests of guides for voltage Performed in methodology and valuation
63. High-voltage tests of surge arresters Performed in methodology and valuation
  20кV Performed in methodology and valuation
  110кV Performed in methodology and valuation
  400кV Performed in methodology and valuation
64. Current measuring transformers Performed in methodology and valuation
65. Measuring transformers - voltage single pole Performed in methodology and valuation
66.  Measuring transformers - voltage bipolar Performed in methodology and valuation
67. In case of request for special tests Performed in methodology and valuation
III. Additional services
No Name of the service Price without VAT    
 VAT Price with VAT
1. Preparation of the load schedule for electricity      
  Weekly 22,90 4,58 27,48
  Monthly 34,35 6,87 41,22
2. Interruption of the transmission of electricity at the request of electric energy trader; supplier of last instance      
  by meter 11,45 2,29 13,74
  by pole 49,75 9,95 59,70
  by distribution unit 99,50 19,90 119,40
3. Reconnection of the transmission of electricity at the request of electric energy trader; supplier of last instance      
  by meter 11,45 2,29 13,74
  by pole 49,75 9,95 59,70
  by distribution unit 99,50 19,90 119,40
4. Express reconnection of the transmission of electricity at the request of electric energy trader; supplier of last instance      
  by meter 22,90 4,58 27,48
  by pole 99,50 19,90 119,40
  by distribution unit 199,01 39,80 238,81
5. Over time 20,02 4,00 24,02
6. Training in safety and conduct of examination certificate of qualification group Price per person    
  1 to 10 people 45,00 9,00 54,00
  11 to 50 people 40,00 8,00 48,00
  51 to 100 people 35,00 7,00 42,00
  over 100 people 30,00 6,00 36,00
7. Measurement of vibration and noise 43,76 8,75 52,51
8. Issuance of reference - duplicate invoice / household and non-household customer / 8,31 1,66 9,97
9. Issuance of reference - a certificate / household and non-household customer / 11,08 2,22 13,30
10. Issuance of reference - for consumption for up to 36 months from request / order bit and non-household customer / 11,08 2,22 13,30
11. Issuing a statement on the disturbances in the power supply for up to 3 months free    
12. Issuing a statement on the disturbances in the power supply for a period of 3 to 6 months 3,54 0,71 4,25
13. Issuing a statement on the disturbances in the power supply for a period of 6 to 12 months 7,08 1,42 8,50
14. Issuing a statement on the disturbances in the power supply for over 12 months 14,16 2,83 16,99
15. Use of specialized equipment / tower , trucks , excavators , ATV and others  performed by methodology and valuation

* The Prices are only for the service, the cost of materials has to be paid separately.

* Deadline for starting work after registration of the service; for regular services:

* Service which concerns other clients - 48 hours

* Service which does not concern other clients - 24 hours

* Express service - up to 6 hours