Price list №1 for services offered by CEZ Distribution Bulgaria for public and corporate consumers effective from 29.05.2013

No

Description

Price BGN without VAT

VAT

Price BGN , VAT incl.

Execution term /days/

1

Temporary connection for moveable objects:

 

 

 

7

1.1

low voltage with direct meter reading

34,70

6,94

41,64

1.2

low voltage with indirect meter reading

110,25

22,05

132,30

1.3

middle voltage 

110,25

22,05

132,30

2

Change of tariff from 1T to 2T (2T electrometer exist and tariff switch is not installed) for indirect meter reading

19,17

3,83

23,00 *

7

3

Change of tariff from 2T to 1T

19,17

3,83

23,00 *

7

4

Change of tariff from 2T or ЗТ to lower (indirect meter reading)

19,17

3,83

23,00 *

7

5

Change of 1Т electrometer to 2Т electrometer and installation of tariff switch

19,17

3,83

23,00 *

7

6

Change of tariffs from 1T or 2T to ЗТ (indirect meter reading)

19,17

3,83

23,00 *

7

7

Change of tariffs for direct meter reading

19,17

3,83

23,00

8

Technical exam at customer request

43,46

8,69

52,15

7

9

Electricity quality monitoring at customer request

 

 

 

 

9.1

-for indirect meter reading

 

 

 

 

 

- without standard device

25,00

5,00

30,00*

7

 

- with standard device

25,00

5,00

30,00*

5

9.2

- for direct meter reading

 

 

 

 

 

- without standard device

25,00

5,00

30,00*

7

 

- with standard device

25,00

5,00

30,00*

5

10

Technical exam of the electrometer at customer request by the Directorate-General for Measures and Measuring Instruments (DGMMI)

 

 

 

7

 

Price is based on 10.1 + 10.2 (total price = price for EDC + price for DGMMI)

 

 

 

10.1

- For EDC

25,00

5,00

30,00*

10.2

 - For Bulgarian Metrology Institute /under Government Decree № 95 of April 19, 2013 for approving the Tariff of fees collected by the Bulgarian Metrology Institute promulgated in State Gazette, number 40 dated 30.04.2013/ updated with number 85, 24.10.2017

 

 

 

 

-single-phase meter

24,00

 

24,00

 

-three- phase meter

36,00

 

36,00

 

-active and reactive energy meter three-phase

90,00

 

90,00

11

Instalation of control meter reading at customer request

30,87

6,17

37,04

7

12

Installation of additional section for additional devices

96,82

19,36

116,18

7

13

Reconnection of the supply of electricity due to non-payment

 

 

 

 

 

- from electric meter or safety fuse

15,83

3,17

19,00 *

1

 

- from distribution grid

19,17

3,83

23,00 *

1

 

- from distribution switchgear

100,42

20,08

120,50

1

 

-   with operational switching

25,00

5,00

30,00 *

7

14

Express reconnection of the supply of electricity due to non-payment /within the working day/

 

 

 

6 hours

 

- from electric meter or safety fuse

31,67

6,33

38,00 *

 

- from distribution grid

38,33

7,67

46,00 *

 

- from distribution switchgear

200,84

40,16

241,00

 

- with operational switching

50,83

10,17

61,00 *

15

Temporary disconnection of the supply of electricity at customer request

 

 

 

7

 

- from electric meter or safety fuse

15,83

3,17

19,00 *

 

- from distribution grid

19,17

3,83

23,00 *

 

- from distribution switchgear

100,42

20,08

120,5

 

- with operational switching

25,00

5,00

30,00 *

16

Reconnection of the supply of electricity at customer request

 

 

 

7

 

- from electric meter or safety fuse

32,03

6,41

38,44

 

- from distribution grid

38,77

7,75

46,52

 

- from distribution switchgear

100,42

20,08

120,5

 

- with operational switching

129,7

25,94

155,64

17

Termination of the access to the electricity distribution grid of the customer

 

 

 

7

 

- from electric meter or safety fuse

37,07

7,41

44,48

 

- from distribution grid

54,66

10,93

65,59

 

- from distribution switchgear

85,64

17,13

102,77

 

- with operational switching

163,11

32,62

195,73

18

Measurement of the electricity quality parameters at LV   (for 7 days)

 

 

 

10

 

- for a single-phase meter

31,67

6,33

38,00 *

 

- for three- phase meter /direct measurement/

31,67

6,33

38,00 *

 

- for three- phase meter /indirect measurement/

31,67

6,33

38,00 *

19

Installation of electrometer owned by the customer

 

 

 

7

 

- with direct measurement

25,00

5,00

30,00 * 

 

- with indirect measurement LV

25,00

5,00

30,00 * 

20

Installation of a load profile electrometer at customer request with installed capacity over 50 kW (effective from 22.08.2019)

 

 

 

30

 

- with direct measurement

544,38

108,88

653,26

 

- with indirect measurement

532,92

106,58

639,50

* Note: The price was changed in relation to an execution of protocol decision of SEWRC №144/06.10.2010.