Service prices

Price list of the services offered to residential and business customers by CEZ Distribution Bulgaria AD

PRICELIST № 1

Proposal for update of the Price list for services executed by CEZ Distribution Bulgaria for public and corporate consumers / updated in line with execution of protocol decision 155/06.10.2008 of the State Energy and Water Regulatory Commission

No Description Price without VAT  VAT  Price with VAT
1. New connections of temporary moveable objects:      
1.1. low voltage with direct meter reading 62,80 12,56 75,36
1.2. low voltage with indirect meter reading 138,60 27,72 166,32
1.3. middle voltage 732,03 146,41 878,44
2. Change of tariff from 1T to 2T (2T electrometer exist and installation of tariff switch) for indirect meter reading 19,00            4,00            23,00
3. Change of tariff from 2T to 1T 19,00            4,00            23,00
4. Change of tariff from 2T or 3T to lower (indirect meter reading)            41,94             8,39            50,33
5. Change of 1T electrometer to 2T electrometer and installation of tariff switch 19,00            4,00            23,00
6. Changeoftariffsfrom1Tor2Tto3T 19,00            4,00            23,00
7. Technical review based on customer order  46,78  9,36  56,14
8. Technical review of device for trade measurement based on customer order      
  with standard device-1 phase electrometer 25,00 5,00 30,00
  with standard device-3 phases electrometer 25,00 5,00 30,00
9. Technical review of the electrometer based on customer order and issue of protocol for standardization of HDMMD      
9.1. 1 phase electrometer         25,00 5,00 30,00
9.2. 3 phases electrometer         25,00 5,00 30,00
9.3. combined electrometers for active and reactive energy         25,00 5,00 30,00
No Description Price without VAT VAT Price with VAT
10. Installation of additional section for additional devices      111,44            22,29          133,73
11. Reconnection of the supply of electricity for a client after not payd bills      
  - from electric meter board      16,00            3,00          19,00
  - from pole         19,00 4,00      23,00
  - operating switching over 25,00    5,00    30,00
12. Express reconnection of the supply of electricity for a client after not payd bills /within the working day/      
  - from electric meter board     38
  - from pole     46
  - operating switching over     60
13. Temporary disconnection and reconnection of the supply of electricity for a client after client request      
13.1. - from electric meter board      16,00            3,00          19,00
13.2. - from pole         19,00 4,00      23,00
13.3. - operating switching over 25,00    5,00    30,00
14. Termination of the registration of the customer and safeguarding      
14.1. - direct meter reading from electrometer  36,98  7,40  44,38
14.2. - direct meter reading from outside network  56.73  11.35  68.08
14.3. - indirect meter reading LV  89,62  17,92  107,54
14.4. - indirectmeterreadingMV  168,05  33,61  201,66
15. Measurement of the quality of the electricity at level Low voltage (one week)      
15.1. - one phase feeding 32,00  6,00  38,00
15.2. - Three phases feeding /direct measurement/ 32,00  6,00  38,00
15.3. - Three phases feeding /indirect measurement/ 32,00  6,00  38,00
16. Installationoftrademeasurementdevice      
16.1. owned by customer 25,00 5,00 30,00
16.2. owned by the Company 25,00 5,00 30,00

PRICELIST № 2

Pricelist of the services offered by the technical and survey departments of CEZ Distribution Bulgaria AD for connecting generators and electricity customers

No Name of the service Price of the service net VAT VAT Price of the service VAT included
1. Survey works on external electricity supply, giving technical instructions and issuing a capacity certificate      
1.1. up to 15 kW 66,13 13,23 79,36
1.2. up to 50 kW 79,99 16,00 95,99
1.3. up to 100 kW 103,11 20,62 123,73
1.4. up to 500 kW 184 36,80 220,80
1.5. up to 1 000 kW 322,67 64,53 387,20
1.6. up to 5 000 kW 710,95 142,19 853,14
1.7. over 5 000 kW 930,80 186,16 1116,96
2. Giving technical advice to designers, design instructions and design revision      
2.1. within 2 hours 55,47 11,09 66,56
2.2. per each following hour 27,73 5,55 33,28
3. Survey on location with designs and investors in connection to design development and execution      
3.1. within 3 hours 86,93 17,39 104,32
3.2. over 3 hours 107,73 21,55 129,28
4. Participation in an acceptance committee 128,53 25,71 154,24
5. Submission of data from the technical database      
5.1. within 2 hours 55,47 11,09 66,56
5.2. per each following hour 27,73 5,55 33,28
6. Issuing a statement for 72-hour dry-run and for DNCS 41,60 8,32 49,92
7. Agreement of electricity meter board      
7.1. electricity meter board LV 25,92 5,18 31,10
7.2. electricity meter board MV 37,96 7,59 45,55
8.   Agreement of external connection for electricity supply      
9. Agreement of a Detailed Site Development Plan,construction regulation plans of residential areas 120 24 144